In suspension bridges, the cables ride freely across the towers, transmitting the load to the anchorages at either end. In cable-stayed bridges, the cables are attached to the towers, which alone bear the load. The cables can be attached to the roadway in a variety of ways.

SNName of ProjectClient NameYear of completion
1. Preparation of Detail Project Report of Bridges in Engineering Package EP-17/074/75 Suspension Bridge Division, Pulchowk 2076
2. Detailed Engineering Survey, Hydrological Analysis, Soil Investigation, Detailed Design and Cost Estimate of Sunbarsighat  Multispan Trial Bridge over Bakraha River, Morang Suspension Bridge Division, Pulchowk 2075
3. Detailed Engineering Survey, Hydrological Analysis, Soil Investigation, Detailed Design and Cost Estimate of  Khutiya  Multispan Trial Bridge over Khutiya River, Kailali Suspension Bridge Division, Pulchowk 2075
4. Detailed Engineering Survey, Hydrological Analysis, Soil Investigation, Detailed Design and Cost Estimate of Kamalpur Multispan Trial Bridge over Balan River Suspension Bridge Division, Pulchowk 2074
5. Detailed Engineering Survey and Design of following Bridges:
·   Kailadi, Kailali (143.8m)
·   Taliya, Kailali (58.61m)
·   Nichatti Sanigad, Dadeldhura (116.79m)
·   Chori Khola, Kailali (230.2m)
·   Chatarbagar, Bajura (171.66 m)
·   Khuddiyun, Bajhang (53.07 m)
SBD, Pulchowk 072/73
6. Detailed Engineering Survey and Design of following Bridges:
·   Khutiya, Kailali (feasibility)
·   Thuligad, Kailali/Doti (220m)
·   Bagun Baitada, Kanchanpur (148.6m)
·   Odal Khola, Kanchanpur (92 m)
·   Ghatte Khola, Bajur (50m)
·   Siddhuri, Bajura (116.4m)
SBD, Pulchowk 071/72
7. Detailed Engineering Survey, Design of following trail Bridges.
·   Dukding Sano Gumdel, Solukhumbu (110.50m)
·   Sugurekhola, Makwanpur  (143.80m)
·   Chiruwakhola, Makwanpur (92.00m)
Feasibilty Study of Following Trail Bridges
·   Bakrakhola Sunbarsighat, Morang
·   Bakrakhola Sugaghat, Morang
·   Hadikhola, Makwanpur
SBD
Pulchowk
070/71
8. Detail Engineering Survey, Design and Cost Estimate of following trail bridges:
·   Bartaghat Trail Bridge, Kaligandaki River (313m)
·    Ratanpur Trail Bridge, Kaligandaki River (254m)
SBD Pulchowk 2070
9. Suspension Bridge Division,DPR Of Trail Bridges Of Package No-C-P-17/074/75 SBD Pulchowk 2076
10.Gauriganj Rural Municipality, Detailed Engineering Survey, Soil Investigation, Hydrological Study & Detailed Design Of Pedestrian Bridges At Gauriganj Rural Municipality
1.       Kishni Khola W.NO. 2 & 5
2.       Geuriya Khola W.NO. 3&6
3.       Geuriya Khola W.NO. 4&6
Gauriganj Rural Municipality 2076

WELCOME TO SAKHUWA ENGINEERING CONSULTANCY.
STAY SAFE AND HEALTHY

X